How is the diesel generator set accepted after completion?

2021-08-24 打印
qq
When the unit is shut down, check whether the appearance, instruments and cable joints of the unit are intact. If any problems are found, they need to be handled accordingly before acceptance;

How to accept the diesel generator set after completion? The acceptance steps are as follows:

1、 When the unit is shut down, check whether the appearance, instruments and cable joints of the unit are intact. If any problems are found, they need to be handled accordingly before acceptance;

2、 After various inspections before startup (including whether the pipeline joints of cooling water, fuel oil and water oil circuit leak, etc.) manually debug the generator set, check whether the parameters of the unit are normal, then shut down, and then conduct automatic commissioning to check whether the parameters of the unit are normal;

3、 After the completion of load test and no-load test acceptance, conduct manual and automatic load test on the unit. Please pay attention to reading the operating procedures of the generator unit and carefully check whether all output parameters of the generator unit are normal and whether the sound is abnormal.

4、 Start part of the load supplied by the generator set and carefully check whether the load operates normally.

5、 Check whether the protection performance of the generator set is intact, safe and reliable.